Position 01Site & Entitlement

Your acreage stops being acreage and becomes a 25-year cash contract.

You keep the title. We take the entitlement risk, the interconnection queue and the construction bill.

Acres required
40–80
Agricultural yield
15–30×
Contracted term
25 yr
Your capital at risk
$0
01Today

The position you are in.

  1. 01

    Farm and transitional land yields a few hundred dollars per acre per year, and the number never moves.

  2. 02

    Rezoning and grid interconnection take three to seven years and cost more than the land is worth as collateral.

  3. 03

    Utilities will not reserve capacity for a load with no tenant, and no tenant signs for a site with no power.

02The exchange

What we hand you.

01

A tenant of record, not a promise

A 25-year ground lease signed at notice to proceed, with 2% annual escalators and a ten-year renewal option in your favour.

02

We fund the entitlement

An option fee at signature, then we carry permitting, interconnection studies, legal and engineering through commercial operation. You fund nothing.

03

Rent plus a position

Base rent, plus a participation right of 5–10% of the project vehicle's distributable cash flow. You are paid twice for the same acre.

04

A clean exit, if you want it

A buy-out right at a pre-agreed cap rate from year five, if you would rather hold the capital than the income.

03The terms

What you sign.

  1. Step 01

    Option & development agreement

    Exclusivity for 24–36 months while interconnection and permitting are proven. Paid, not free.

  2. Step 02

    Ground lease at COD

    Commences at commercial operation, so rent starts when the campus starts earning.

  3. Step 03

    Participation agreement

    Your share of distributable cash flow, with audit rights and a defined exit mechanic.

04Risk transfer

What leaves your book.

  • Entitlement and permitting risk
  • Interconnection queue position
  • Construction cost overrun
  • Tenant credit risk
Your next step

We open with a confidential term sheet and a two-week feasibility study on the asset you already hold. No commitment until the numbers are on the table.