Skip to content
Position 05Jurisdiction & Sovereignty

Sovereign compute, in country, on contract.

A national pool of 10,000 H100s with residency guaranteed by architecture, public-sector allocation and a domestic skills pipeline — with no hyperscaler dependency.

GPU national pool
10,000
Public-sector reserve
2–5%
In-jurisdiction
100%
Anchor campus
1
01Today

The position you are in.

  1. 01

    Agency, university and startup AI capacity is rented from foreign hyperscalers under foreign jurisdiction.

  2. 02

    Data residency commitments are contractual promises, not physical facts.

  3. 03

    Compute procurement is a cloud line item that leaves the country every month.

02The exchange

What we hand you.

01

A sovereign zone, not a region

Physically in-country, operated under local law, auditable at the rack, with residency enforced by architecture rather than by clause.

02

A national reserve

2–5% of the 10,000-GPU pool ring-fenced for public research, agencies and national programmes at cost-plus pricing.

03

Domestic supply chain

Local operations, electrical and mechanical contracting, and a certification programme that turns the campus into a skills engine.

04

Grid-aligned growth

Load that follows generation build-out, with curtailment behaviour that supports the energy transition instead of competing with it.

03The terms

What you sign.

  1. Step 01

    Framework agreement

    The national programme, its allocation rules and the reporting obligations on both sides.

  2. Step 02

    Sovereign zone designation

    Legal recognition of the campus as in-jurisdiction compute, with audit rights.

  3. Step 03

    Public-sector allocation schedule

    Reserved capacity, price ceiling and the process for agencies and universities to draw on it.

04Risk transfer

What leaves your book.

  • Foreign jurisdiction exposure
  • Residency compliance risk
  • Procurement capital leakage
  • Domestic skills gap
Your next step

We open with a confidential term sheet and a two-week feasibility study on the asset you already hold. No commitment until the numbers are on the table.

Discuss a national programme